Project Details

Project information

  • Category Structural Model
  • Scope LOD 300
  • Similar Projects 1
  • Cost Reduction __IN THE PROJECT CAPITAL COSTS DUE TO BIM DESIGN OPTIMIZATION
  • Time Saving __DUE TO OPTIMUM COORDINATION AND CLASH DETECTION
  • Deliverables Structure