Project Details
Project information
- Category High Rise Building Project
- Scope LOD 300 + 400 + 500
- Similar Projects 3
- Cost Reduction 17.25%IN THE PROJECT CAPITAL COSTS DUE TO BIM DESIGN OPTIMIZATION
- Time Saving 18%DUE TO OPTIMUM COORDINATION AND CLASH DETECTION
- Deliverables Structure