Project Details

Project information

  • Category High Rise Building Project
  • Scope LOD 300 + 400 + 500
  • Similar Projects 3
  • Cost Reduction 17.25%IN THE PROJECT CAPITAL COSTS DUE TO BIM DESIGN OPTIMIZATION
  • Time Saving 18%DUE TO OPTIMUM COORDINATION AND CLASH DETECTION
  • Deliverables Structure